Client: Van Oord Australia
Scope of Work:
- Installation of 3 X cyclone moorings.
- Installation of 3 X day moorings.
- Towing hopper barges from dredge to spoil ground for dumping of material.
- Towing and unloading of barges of rock from the dredge site into Half Tide Tug Harbour.
- Moving the dredge to and from site and supporting the dredge movements.
- Supplying commercial divers to support the drilling and explosives operations.
- Time Chartering of a tug for the operation.
- Chartering of 2 X flat-top barges and the fitting of deck protection.
Time: March to November 2010