Hammond Island Continues

PMG have headed back to Hammond Island to complete the project. There is a lot of equipment in these pics, including PMG182 fitted with a 100T crawler crane, PMG121 fitted with a 70T crawler crane. Onboard we also have all the pontoons, piles and gangways needed for the final install, as well as a small top up armour rock shipment. We also have a drill rig and grouting spread to install the piles in the hard ground. The 2 barges are towed by 2 tugs - PMG Tarka and PMG Sailfish. Works are progressing well on site.