Scope of work
Pipeline installation and underwater construction activities associated with installation of Hamilton Island to Dent Island water pipeline including:
-
Tow out, position and S Bend sink pre‐assembled 3 x linked HPDE pipelines on Hamilton Island.
-
Mobilise tug + barge barge from Townsville to Hamilton Island for block install
-
Survey trench at Dent and Hamilton Island
-
Seabed survey along pipeline route, prior to pipeline installation
-
Install 150 concrete ballast blocks onto sunken pipeline
-
Final inspection of installed pipeline and concrete ballast blocks by diver