Cyclone Moorings Install Svitzer Bowen

Scope of work

Installation of 2 x cyclone moorings for Svitzer tugs located at Bowen. The moorings were traditional Admiralty style 3 x anchors (3T Stingrays)/70mm chain leg moorings. The moorings were installed under supervision by the mooring designers (AMOG), using PMG Pride and our Sheerlegs crane barge.

Make an Enquiry

BACK TO PROJECTS

Client
Svitzer Bowen / AMOG

Time
2012

Contract Value
300K

BACK TO PROJECTS
Download
Case Study

Make an Enquiry